HTML SitemapExplore
Find Things to DoFind The Best Restaurants
Find Things to DoFind The Best Restaurants

Seeing the Oculus from Different Perspectives(2)

The main structure of the building is made of white steel and glass. With the help of BIM technology, the complex curved surface structure was realized. 🎒🌟The underground level was cleverly designed to bypass the track of Subway Line 1. πŸŒ† Challenges and Controversies: The original budget was $2.2 billion. However, due to safety reinforcement, damage from hurricanes, and design adjustments, the final cost doubled to $4 billion. The construction was also delayed by 7 years. ⏳ 🎒🌟 Technological Innovation: Cable-stayed arch bridge technology was used to support the subway tracks. For the first time in a transportation hub, a skeletal structure was applied. πŸ›£οΈ Social Significance: As a memorial landmark for 9/11, its construction process met the emotional healing needs of New Yorkers. ❀️ Transportation Hub: It connects 11 subway lines, the PATH railway, and the pedestrian system, serving an average of 300,000 commuters daily. πŸš‡ 🎒🌟 Commercial Complex: The Westfield shopping center is integrated within, consolidating 90,000 square meters of commercial space in the surrounding area. #FuturisticArchitecture #ArchitecturalDesignInspiration 🌊

Related posts
New York's Cool Hotel: Public Hotel (2)🌟This Facial in the East Village Was So Comforting 🌟3-Day Manhattan Essentials Travel Guide(1)This Hidden Amusement Park in Upstate NY Feels Like Summer in the 1950sβ€”With Tilt‐A‐Whirls & Lakeside Cotton CandyNew York's Hardest-to-Book Restaurant Unlocked πŸ”“πŸ‡ΊπŸ‡ΈNYC | A Hidden Brunch Gem That Outshines the Hype πŸ₯žβœ¨
Mindy Kaling
Mindy Kaling
4 months ago
Mindy Kaling
Mindy Kaling
4 months ago
no-comment

No one has commented yet...

Seeing the Oculus from Different Perspectives(2)

The main structure of the building is made of white steel and glass. With the help of BIM technology, the complex curved surface structure was realized. 🎒🌟The underground level was cleverly designed to bypass the track of Subway Line 1. πŸŒ† Challenges and Controversies: The original budget was $2.2 billion. However, due to safety reinforcement, damage from hurricanes, and design adjustments, the final cost doubled to $4 billion. The construction was also delayed by 7 years. ⏳ 🎒🌟 Technological Innovation: Cable-stayed arch bridge technology was used to support the subway tracks. For the first time in a transportation hub, a skeletal structure was applied. πŸ›£οΈ Social Significance: As a memorial landmark for 9/11, its construction process met the emotional healing needs of New Yorkers. ❀️ Transportation Hub: It connects 11 subway lines, the PATH railway, and the pedestrian system, serving an average of 300,000 commuters daily. πŸš‡ 🎒🌟 Commercial Complex: The Westfield shopping center is integrated within, consolidating 90,000 square meters of commercial space in the surrounding area. #FuturisticArchitecture #ArchitecturalDesignInspiration 🌊

New York
Oculus Center
Oculus CenterOculus Center